Opens in a new tab

Project Type: New Plant

Fornidos Home Systems to Open Panelized Housing Factory at Gateway South in St. Louis

Fornidos to Open Panelized Home Factory in St. Louis

Fornidos Home Systems Inc. has signed a lease for a new 55,000-square-foot manufacturing facility at Gateway South, an approximately 100-acre redevelopment district in St. Louis, Missouri. The company will build panelized housing components for the region at the site.

New light-manufacturing building

The planned 54,600-square-foot building at 1120 S. Second Street will have 32-foot clear heights and dock-high loading. ARCO is the design-builder. Construction is scheduled to start in the first quarter of 2027, with delivery in the fourth quarter of 2027. Fornidos plans a temporary St. Louis operation in the meantime.

Factory-built panels

Fornidos makes factory-built foundation, wall and roof panels designed for rapid on-site assembly. The company joins Schaeffer Electric and Construction Forum at Gateway South, which is being developed as a construction innovation district.